Skip to content
Jber Coffee LimitedGreen Coffee · Origin Supply

Coffee Export

Green Coffee Quality Inspection

Inspection is the control that turns a specification into something enforceable. This page covers what is actually inspected, who does it, and — most importantly — how the sample gets drawn, because that is where inspection either works or does not.
Last reviewed 2 min read

Quick answer

Pre-shipment inspection verifies that the parcel about to be loaded matches what was contracted. It normally covers sampling to an agreed method, physical analysis — moisture, screen, defects, sometimes water activity and density — and cup evaluation against the approved sample, with weight and bag count verified at stuffing.

Sampling is the whole game

An unrepresentative sample makes every downstream test meaningless

Every figure an inspection produces describes the sample, not the parcel. If the sample was drawn from the accessible bags at the door of a container, the analysis describes those bags. Agree the sampling method before agreeing anything about tolerances.

  • Number of bags sampled — a defined proportion of the parcel, not a fixed handful.
  • Draw method — probe or trier, and how many draws per bag, taken at different depths.
  • Compositing — increments combined, mixed and reduced by an agreed method to the final sample size.
  • Sample size — large enough to support a defect count and a cupping with cups to spare.
  • Retention — sealed retained samples held by both parties, so a later dispute has a reference.

What is inspected

The pre-shipment inspection scope
TestWhat it establishesTypical basis
MoistureWater content against the contract ceilingAgreed method and instrument
Water activityStorage stabilityWhere specified; increasingly common on specialty
Screen analysisSize distribution against the contracted screenPercentage retained per screen
Defect countPhysical cleanliness against toleranceFull defects per defined sample
DensityBulk density for roast planningWhere specified
Colour and odourCondition and absence of taint in the greenVisual and olfactory
Cup evaluationConformity to the approved sampleMultiple cups, blind where possible
Weight and bag countQuantity against contractAt stuffing, with the seal recorded

Who inspects

Inspection arrangements
Exporter’s own QCIndependent surveyorBuyer’s representative
CostIncludedCharged per inspectionBuyer’s cost
IndependenceNone claimedFullAligned with buyer
SpeedFastestRequires schedulingRequires travel or a local agent
Standing in a disputeLimitedStrongStrong for the buyer
Typical useRoutine lots, established relationshipsNew relationships, large volumes, LC termsHigh-value or contentious parcels
These are not exclusive. Exporter QC on every lot plus independent survey on higher-value or first shipments is a common and sensible arrangement.

Timing and what it constrains

Inspection has to happen late enough that the coffee inspected is the coffee shipped, and early enough that a problem can still be fixed. In practice that means after final milling and before stuffing.

Practical sequence

  1. Step 1

    Final preparation

    Milling to the contracted grade and screen completed.

  2. Step 2

    Pre-shipment sample drawn

    To the agreed sampling method, from the milled parcel.

  3. Step 3

    Analysis and cupping

    Physical analysis and cup evaluation against the approved sample.

  4. Step 4

    Buyer approval

    Sample sent and approved, or waived by contract for routine repeat parcels.

  5. Step 5

    Stuffing

    Weight, bag count, seal number recorded; loading photographed.

Writing the inspection clause

Who inspects
Named party or agreed surveyor
Sampling method
Explicit — proportion of bags, draws, compositing, final size
Tests and standards
Which tests, to which method, with which instrument
Point of determination
Origin, load port or arrival — for quality and for weight separately
Retained samples
Held by whom, sealed how, for how long
Tolerances
Permitted variance for each parameter
Consequence
Allowance, rejection, or independent re-determination
Cost
Who pays, including who pays for a re-determination

Our pre-shipment QC

See the workflow we run on every lot, and what a pre-shipment report contains.

Quality assurance

Frequently asked questions

What is pre-shipment inspection?
An inspection carried out after final milling and before container stuffing, verifying that the parcel matches the contracted specification. It normally covers sampling, physical analysis, cup evaluation and — at stuffing — weight and bag count.
Do I need an independent surveyor?
Not always. For established relationships and routine parcels, exporter QC plus a pre-shipment sample is usually sufficient. Independent survey is worth its cost on first shipments, large volumes, letter-of-credit transactions and high-value lots.
How is a coffee sample drawn from a parcel?
With a probe or trier, taking multiple increments from a defined proportion of the bags at different depths. The increments are combined, mixed and reduced by an agreed method to the final sample size. The method should be in the contract.
What happens if the pre-shipment sample fails?
What the contract says. Common outcomes are re-preparation of the parcel, substitution of a conforming parcel, an agreed price allowance, or cancellation. Agreeing the consequence in advance is what stops a failed sample becoming a dispute.

Tell us the coffee you need

Lots can be specified by origin, region, process, grade, screen, moisture, defect tolerance, crop year and packaging. Send what you know and we will confirm what each origin realistically supports.